Appel: +(86) 137 7712 9988
Emplacement du bureau:

​No.789 Xiaying Road, Ningbo, Zhejiang China

Industrie leader:

Outils de ligne électrique

Leader industriel:

En Chine

Aluminum alloy Single lattice-like aluminum gin pole

Aluminum alloy Single lattice-like aluminum gin pole

Single lattice-like aluminum alloy gin pole is used for assembling and erecting the pole towers in line construction.The safety factor is 2.5.

​About E-Grid

​Ningbo Eastern Grid Power (E-Grid) is China leader in designing, manufacturing and supplying hydraulic brake tensioners for stringing operations, ideal to allow operations to be carried out with the highest accuracy, speed and safety.

Description
Single lattice-like aluminum alloy gin pole
Order NumberModelAllowable axial load (kN)Weight (kg/m)Order numberModelAllowable axial load(kN)Weight (kg/m)
3211LBD250-83710.53255LBD400-16B3816.5
3212LBD250-9293256LBD400-17B35
3213LBD250-10232357LBD400-18B30
3214LBD250-11192358LBD400-19B26
3215LBD250-12163259LBD400-20B23
3216LBD250-13133261LBD500-14A7518
3217LBD250-14113262LBD500-15A70
3218LBD250-15103263LBD500-16A64
3221LBD300-1035113264LBD500-17A57
3222LBD300-11303265LBD500-18A50
3223LBD300-12243266LBD500-19A45
3224LBD300-13223267LBD500-20A41
3225LBD300-14183271LBD500-14B12022
3226LBD300-15163272LBD500-15B110
3227LBD300-16133273LBD500-16B100
3231LBD350-114013.53274LBD500-17B88
3232LBD350-12333275LBD500-18B77
3233LBD350-13303276LBD500-19B70
3234LBD350-14243277LBD500-20B65
3235LBD350-15223281LBD600-15A8720
3236LBD350-16193282LBD600-16A81
3237LBD350-17173283LBD600-17A75
3238LBD350-18153284LBD600-18A70
3241LBD400-12A4314.63285LBD600-19A65
3242LBD400-13A383286LBD600-20A60
3243LBD400-14A323287LBD600-21A55
3244LBD400-15A283288LBD600-22A49
3245LBD400-16A253291LBD600-15B14024
3246LBD400-17A223292LBD600-16B128
3247LBD400-18A193293LBD600-17B119
3248LBD400-19A163294LBD600-18B111
3249LBD400-20A143295LBD600-19B104
3251LBD400-12B6516.53296LBD600-20B94
3252LBD400-13B573297LBD600-21B85
3253LBD400-14B503298LBD600-22B76
3254LBD400-15B44
Use

For assembling and erecting the pole towers in line construction.

Note

In model names, “A” means universal style and “B” means strengthened style.

Model explanation

LB X1 X2 – X3
LB : Aluminum alloy gin pole
X1: Stucture
NXG: inner-suspended tubular
NX: inner-suspended lattice​
GT: tubular tower mounted
GR: tubular A shape
R: lattice A shape
GX: tubular tripod
X2: for lattice type it is side length, for tubular type it is diameter unit mm
​X3: length of the entire gin pole unit: m

Support abutments for tower-mounted small gin poles


Order number32013202
ModelJT130JT200
Maximum size of angle iron¡Ï125¡Ï200
Rated load (kN):2020
Weight (kg)925

Application

The derricks have been specifically designed for installation of towers, poles and vertical structures and they are manufactured in tubular welded light aluminium alloy reticular structures. They are available in sections of different lengths to be connected to reach the required total length. The derricks have swivel head and swivel base and they are pre-set for external rope passage.

​Structure

To choose the correct derrick it is necessary to specify :
1.derricks total length required
2.derricks working position (see the working pictures)
3.lifting load required “C”​

How to choose the right model

1. Check in the total capacity required according to the lifting tackle type to be used and the “C” lifting load required.
2. Identify the correct derrick type according to the total capacity, the length and the working position required.

Special design derricks are supplied on demand (e.g.in case of not standard lengths, internal rope passage with special suspended working position attachment etc.)

Working pictures:
Aluminum alloy Inner suspended tubular gin pole
Quality Control

We have the complete production equipments and professional production team to manage the whole process from production to packing shipment. All products will 100% test before delivery to ensure the quality.
​Remarks
We can supply all kinds of stringing equipment according to customers’ requirements.

Shipment

1. The machines will be shipped in container.
2. We will ship the products within one month normally after receiving the payment.
3. Stock is available for standard product.

Payment

​1. We accept T/T and L/C.
2. Please send swift copy of T/T if you arrange payment by T/T.
3. Please send us the L/C draft to us before issue L/C.

Why choose us

1. High quality and competitive price.
2. Leading and biggest manufacture for stringing equipment in China.
3. 25 years of production experience and more than 1000 customers in the country and abroad market. The machines have been sold to more than 20 countries.
4. Big stock condition for fast shipment.
5. Detailed pre-sales service and fast active after-sales service. Response within 12 hours after-sales service.